25 / 25 / 10
Panels: 25-year product + performance. SunPower microinverters: 25-year. Third-party string inverters: 10-year.
# warranty-snapshotSite survey is non-negotiable
Every install requires one. Same-week scheduling in most territories. Do not promise skip.
# install-prereqsGenerator + transfer switch
Single-phase, 240V generators only. Hybrid inverter side only. Verify before promising compatibility.
# generator-supportDirect vs EPC vs PIP
Direct = in-house SunPower reps. EPC = partner installers under SunPower umbrella. PIP = Preferred Installer Program (separate tier, separate owner).
# channel-splitWhat actually counts as URGENT
Customer threatening to walk. Signature blocked right now. Safety/code/legal risk. Post-install outage. Everything else is NORMAL or LOW.
# urgency-rubricThe In-Appointment pledge
Picking the "In Appointment!!!" lane requires a one-tap confirmation that the customer is in the room. Abuse gets flagged and future requests de-prioritized.
# pledge-ruleSix scaffold cards only. Add or remove as the knowledge base evolves. Long-term this page should be generated from the same source the bot reads.